It would be very useful to be able to change the design code after the project has been initially set up. This would be useful if the incorrect design code was chosen at the start of the project, and also if the design code changes over the course of a project.
This would help us significantly as well with projects that are for production and semi-custom buildings. Due to the repetitive nature of their floor plans, they use essentially the same design package over and over again for years but every time the code changes we essentially have to data entry the entire package back into Forte just to get it over to the new code even though nothing is really changing. Just being able to change the code drop down would be significant and I feel like that would be more in-line with most other design software.
This feature is also needed for jobs that are repeated, and the building code is updated.