Sometimes for notched TJI joists, a repair is not possible and we have to frame around the damage and send new header loads to adjacent joists. I would love it if FW had a "loading assistant" - similar to what we do in the Loads tab for window headers. This would save the time to establish the size of the loads from the new header that need to be sent to the supporting members.