It would be nice if there was an option to be able to apply only a percentage of a linked load that would update overtime as well. For instance, we are designing a beam to have 2 post directly beneath if for bearing and I currently have to apply loads and update them manually for each individual column, instead of having the option to put 50% load linked from the beam to each column.