Forte Software Ideas
Add a new idea
Filter by status
Need More Info
9
Will not implement
5
Planned
1
Shipped
55
Functionality Exists
46
Log in / Sign up
Identify yourself with your email address
Email address
Recent
Trending
Popular
2
Vote
I think the graphic display of your design summary could be easier to read.
I am attaching an example of how I think it should look. Repeating the Mamber Name, Results, Current Solution and Comments again and again just confuses the eye (I think).
Created 29 Jan 06:12
0
1
Vote
Double Span out of plane loads
Most of my header designs are for double span headers (ie. (1 or 2) 2x8 that span over two adjacent windows/doors with a mid span post). We generally design them as two spans for gravity loading ((3) supports) and as one long span for out of plane...
Created 16 Dec 17:20
0
2
Vote
Add amount of eccentricity in column loads to report tab
When I look at free standing post report, the loads do not show what eccentricity was input. That's good info to have.
Created 07 Jan 13:20
1
1
Vote
Double Layer 5/8" Gypsum
Living areas over garages require 2 layers of 5/8 gypsum board. How does this effect Pro Rating and should we be concerned with the additional weight on the bottom cord
Created 14 Dec 19:45
0
1
Vote
can we flip calcs?
Sometimes houses flip from a right swing to a left swing. Can there be a future update for flipping the calc to a member so i don't have to edit my calcs from the opposite side?
Created 18 Nov 16:43
0
1
Vote
Provide more detailed output
The results do not show enough information. It would be great if additional information is provided with results......more detailed calculations, equations used, design specifics.
Created 16 Nov 17:59
0
1
Vote
Add steel beam as an option to the end condition for floor joists to hang from.
Add the option to hang a beam off of the end of a joist with
Created 15 Nov 16:45
0
2
Vote
Later/Drag Design Tool
via Rob Miller: The Mitek software (and others) allow their designers to design for lateral loads in the drag/collector truss, as specified the project engineer of record. This makes conversion and original TJI specification by project engineers d...
Created 23 Oct 23:16
0
2
Vote
Level Name in Linking
It would be nice to see what Level Name the beam is located on when Linking loads. Right now it lists the beam name but if we have a beam labelled C1 on the first floor and the second floor level it would be hard to tell them apart without going i...
Created 15 Oct 22:51
0
1
Vote
Add built-up column
No description provided
Created 26 Oct 12:40
0
« First
‹ Prev
…
27
28
29
30
31
32
33
34
35
…
Next ›
Last »