Forte Software Ideas
Add a new idea
Filter by status
Need More Info
9
Will not implement
5
Planned
5
Shipped
51
Functionality Exists
46
Log in / Sign up
Identify yourself with your email address
Email address
Recent
Trending
Popular
33
Vote
Copy a member file into another member file.
I would like to use a specific calculation from one file and import it into another file. Sometime my calc are redundant and instead of doing them over and over I would just like to copy or save it under a quick calc file or something.
Created 09 Aug 16:45
4
32
Vote
Make enter key move to the next field like it did in the desktop version.
then we can just use the keypad.
Created 18 Jun 17:24
5
32
Vote
Undo Option / OPTION DE RETOUR EN ARRIÈRE
IL SERAIT TRÈS APPRÉCIÉ D'AVOIR UNE OPTION DE RETOUR EN ARRIÈRE POUR ANNULER LA DERNIÈRE MANIPULATION. English: IT WOULD BE VERY APPRECIATED TO HAVE AN OPTION TO RETURN BACK TO CANCEL THE LATEST HANDLING.
Created 14 Jun 11:55
6
1
Vote
Etre capable de choisir des assemblages de poutre 1 3/4" + 3 1/2 pour donner un 5 1/4"
Créer des assemblage directement dans Forte 1 3/4" + 3 1/2" = 5 1/4" 1 3/4 + 3 1/2 + 1 3/4 =7" Ca permettrais d'avoir la réalité pour le clouage des poutres
Created 06 Mar 12:37
0
2
Vote
Include option to output full member reports (with all load combinations) when printing designed members
It is not immediately apparent to plan reviewers that all of the ASCE 7 load combinations (including special seismic combinations) have been taken into account by the software when only the critical (controlling) load combinations are shown on the...
Created 07 Jan 19:40
0
8
Vote
Limit absolute deflection in inches
I'd like the ability to enter a deflection limit in inches (not L/xxx) on the Member Info tab.
Created 25 Jan 16:06
0
20
Vote
Dark Mode
Add a dark mode feature
Created 19 Nov 19:47
6
1
Vote
Shed roofs with non structural ridge
I'd appreciate if Forte would be able to design roofs without a structural ridge, meaning that I can select rafters with only 1 support & have the full load totaling only on that side.
Created 28 Feb 17:24
0
6
Vote
Smarter load start/stop locations
We should be able to also select certain supports from a drop down menu or something where a load starts/ends, instead of always manually entering the distance all the time. This should be the case for each load type.
Created 30 Mar 17:23
1
1
Vote
Include checks for fire design per the latest NDS
It would be nice to have it also calculate the fire design checks based on input of 0 hr, 1 hr, 1.5 hr, or 2 hr fire-rating
Created 24 Feb 03:28
0
« First
‹ Prev
1
2
3
4
5
6
7
8
…
Next ›